Wednesday, September 09, 2009

PTS - Core Administrative Module

The Administrative Module is the core module that provides the facilities to:

  • Manage projects (Create and edit project information)
  • Link projects to their respective packages or systems (Add, edit and delete packages from a project)
  • Link individual packages to their respective project plans
  • Associate users with various projects and project groups
  • Provide each user with specific roles and privileges to access various project details through the client module
  • Create, edit and maintain a list of all manufactured and supplied items for each package in each project. These items are then tracked during the following project phases: Item manufacturing and inspection, item dispatch, item receipt at plant site, item erection
  • Link design review groups to their respective project plan activities
  • Link pre-award activities to their respective project plan activities, including: Notice inviting tenders, opening of bid documents provided by bidders for each package, reciept of the letter of acceptance from bidders
  • Create and manage specific lists of "Sensitive Activites" for each package. Sensitive Activities are tracked for delays through the life of a project

This is the final installment in a ten-part series about UTS's Project Tracking System.

Labels:

Wednesday, September 02, 2009

PTS - Document Management Module

Every activity in a Project Plan involves documentation, which may be shared across teams or among team members. PTS provides upload, filtering and search facilities for viewing information pertaining to Project activities. These may include documents that are internally generated and then uploaded for sharing with other Project or team members.

Documents can be readily viewed. Supported formats include Microsoft Office, PDF, TXT and RTF and DWG files. Support for specific file extensions can be added as needed.

This post is the ninth in a ten-part series about UTS's Project Tracking System. Check back next week for the final installment, which will discuss the core Administrative Module.

Labels:

Wednesday, August 19, 2009

PTS - Corporate Client Module

PTS comes with an elaborate Dashboard that provides point-and-click access on the status of every Package and every ongoing Project. Information on planned and previous Projects can also be accessed and reported.

The Client Module provides a privilege-based view of all activities in the Project Plan. For each Package in each Project, the status (percentage completed) of each activity and a consolidated completion status–rolled up to the Package and Project levels–can be readily accessed. The Client Module also provides a number of default reports. These include:

Project Group Progress report
Package Pre-Award report
Running Project Cost Report
Time Tracker Report
Package Listing Report
Billing Breakup Units Report (BBU or manufactured and bought out item groups and individual items in each group)
Activity Alert Report (for viewing the status of various Project activities and identifying the ones that are running late for more timely action)
Sensitive Activity Report

Project participants interact primarily with the client module on a day-to-day basis to update status and time-related information.


Here are some typical Corporate Client Module screens:

Interface for updating action taken for critical and sensitive activities


Resource Cost Rate Table for Project Running Cost calculations based on entries in the Time Tracker Module

This post is the seventh in a ten-part series about UTS's Project Tracking System. Check back next week to read about the Meetings Management Module.

Labels:

Wednesday, August 12, 2009

PTS - Time Tracker and Cost Information Module

Every project utilizes an intangible resource–time–which adds to the cost of any project. Human resource costs are sometimes calculated in an ad-hoc manner or get averaged across projects. Consequently, the time spent by Engineers, Reviewers, Site Inspectors, Site Managers and other project entities is missed. The TTC module provides a time sheet with a login and password for every project participant. Individuals’ time is tracked on a daily basis to provide a complete cost estimate in terms of resource hours. TTC can readily monitor a more precise running cost for each project if the cost rate information is provided. The following image shows a typical Time Tracker interface:


Dialog showing how PTS users can make task-based time sheet entries into the system.



This post is the sixth in a ten-part series about UTS's Project Tracking System. Check back next week to learn about the Corporate Client Module.

Labels:

Wednesday, August 05, 2009

PTS - Site Managers Module

Site Managers who oversee the receipt of shipments use the Site Managers Module to enter the status of each manufactured or bought-out-item received. They can also enter real-time information on the progress of various erection activities such as Chimney Piling, Boiler Structure Erection, and Cabling. The progress of erection activities and shipments is entered in specific (and customizable) units pertaining to each item. For example, steel shipments may be measured in metric tons while pile caps would be in quantity units.

Site Managers enter progress data via a web-based module. All data received from each site is analyzed and compared with the Project Plan activities to ensure that all delayed activities get reported quickly. The Site Managers module includes customizable interactive graphical interfaces for specific activities such as Chimney Piling, ESP Foundation Piling, Boiler Erection and other activities. A typical Site Managers Module Interface, and other sample screens from the Site Managers Module, are shown below:

Site Managers Module interface for providing updates on item deliveries and progress at the plant site.


Sample interface for Site Managers to provide updates on Chimney Piling Progress.


Example of another interface for providing updates on piling activities.

This post is the fifth in a series about UTS's Project Tracking System. Check back next week to learn about the Time Tracker and Cost Information Module.

Labels:

Wednesday, July 29, 2009

PTS - Site Inspector Module

Large projects (such as Power Plants) require on-site inspectors at the manufacturing site to ensure that outgoing shipments meet the original requirement specifications. If a manufactured item is found to meet the original specifications and quality constraints it receives approval for final shipment to the site. This is often referred to as a Manufacturing Dispatch Clearance Certificate or MDCC.

PTS provides a web-based interface for each site inspector to enter the inspection status for each manufactured part that is about to be shipped. Each part is then compared to the corresponding activity in the Project Plan. If the inspection and/or shipment gets delayed PTS automatically raises a warning that corresponds to the activity in the Project Plan.

This post is the fourth in a series about UTS's Project Tracking System. Check back next week to learn about the Site Managers Module.

Labels:

Wednesday, July 22, 2009

PTS - Manufacturer or Vendor Module

Manufacturing activities are invariably done at remote locations. Each vendor has the responsibility of manufacturing and dispatching multiple parts (sometimes thousands of parts depending on the size of the package) from the manufacturing site to the project plant site.

PTS provides a simple and self-sufficient module for each vendor, allowing them to enter the status of every manufactured component and its shipment status and other relevant details such as LR/GR number. Manufacturers can also switch between multiple Projects and multiple Packages. The only things they receive are a web address, a username, and a password for accessing their web site.

This post is the third in a series about UTS's Project Tracking System. Check back next week to learn about the Site Inspector Module

Labels:

Wednesday, July 15, 2009

PTS - Engineering Calculations Module

The DR Module (see last week's post) is accompanied by TK Solver, a powerful Engineering Calculations Module which aids in solving the most challenging engineering design problems. Design equations can be entered directly into TK Solver and solved instantly. Outputs and different sets of inputs for each design can be saved as part of every calculation model, allowing reviewers to instantly perform “what-if” calculations during the Design Review Process. TK Solver can accept up to 32,000 design equations and up to 32,000 variables in a single calculation. This module includes an Optimizer for performing non-linear optimization, Engineering Plots, Support for Tables, Advanced Units Conversion and List Solving.

This post is the second in a ten-part series about UTS's Project Tracking System. Check back next week to read about the Manufacturer or Vendor Module.

Labels: ,